SAP operating system
Experienced with team leadership, process optimization, and strategic planning. Utilizes strong organizational and problem-solving skills to enhance team performance. Track record of fostering collaborative environments and achieving operational goals.
Operations improvement
Staff leadership
Staff development
Resource allocation
Continuous improvement
Asset management
Staff planning
Team management
Jan 2011 – Present
Nobel nc Co., Ltd
Position : Project and reliability section manager
1.Leader team for job turn around ( Shut down maintenance )
2. Reliable plant for machine
3. Project vertical start-up and support Project Requirements
Reference job for me take care turn around shut down
Other job for civil work and maintenance machine for time base or break down base
January 2008 to 2011
Nobel nc Co., Ltd
Position : Electrical Engineer
My job is service all electrical this factory .My Factory is new building . I design and develop all system about Electrical Etc.
1. I work project substation by we choose type AIS this budget project around 28 million THB
2. Design All High Volt and Low Volt system Electrical
3. System back up by Generator
4. Lighting model Explosion proof because This factory product Chemical.
5. And I take care project preventive maintenance at this factory by use program Cimco
Detail program Cimco have option
- Work order Job
- Master Plan PM per year
- Safety stock spare part
- Check Cost maintenance and cost preventive maintenance
6. I modify and Improvement reliability machine.
May 2002 –2007
Dairy Plus Co., Ltd (Dutch Mill Group)
Position : Utility engineering supervisor
The responsibility
1. Plan Production Utility support Plant product.
2. Maintenance Machine of Utility Machine
2.1 Electrical ( Brand Agarat Transformer )
2.2 Boiler 15 Ton ( Brand Bunyium) and LPG System ( Fuel )
2.3 Air compressor system ( Brand Ingerolland )
2.4 ICE water system ( Brand my com Installation by pattkol )
2.5 Water system
2.6 Cooling Tower system
3. Management line Utility
And I have Knowledge Energy saving because I take care Project
Analysis
Dec 2004 – Dec 2006
Dairy Plus Co., Ltd (Dutch Mill Group)
Position : Project engineering supervisor
The responsibility
1. Design concept, estimate budget and sent to customer for to make decision.
2. Project feasible analysis
- Breakeven point analysis
- Advantage & Disadvantage
- Effect (product, operation, safety, environmental, etc.)
- How long
- Difficult or not & new alternate
3. Present the project to Manufacturing Director for request budget.
4. Actual design, make the BOQ and found the contractor
5. Set project schedule
6. Onside supervised
- Check the accuracy of work versus the drawing.
- Quality of work
7. Control the budget.
8. Control work schedule for delivery on time.
9. Check quality of project & test before delivery to customer.
Description of Project take care by me
1. Apartment 48 room 4thand Apartment 32room 4th
2. CCTV system
3. Installation Machine all assembly
3.1 Product machine Tatra brik machine ( TBA )
4. Straw Machine system
5. Silo 1000 Ton Import by USAand system Dehauling to sprit bean
6. Color Sortor Machine
7 Cold Room System
May 2001 – Dec 2004
Dairy Plus Co., Ltd (Dutch Mill Group)
Position : Production supervisor
The responsibility
- To prepare the production plan, provide human force, raw material and machine, suitable for operation.
- Evaluate the operation procedure and maintenance of the machine in order to increase its efficiency as well as solute various problems happening in production line.
- Check the data, documents and reports involved in the production process & collaborate to other units.
SAP operating system
Solid Work ( 3D )
AutoCAD
Microsoft Project
Microsoft Visio
Visual basic