With over 26 years of experience in quality assurance, quality control, and non-destructive testing (NDT) in the construction, oil and gas, power plant, and mining sectors, I bring extensive expertise in managing complex projects and ensuring compliance with international standards.
Throughout my career, I have successfully led QA/QC teams, implementing comprehensive quality management systems and conducting construction surveillance programs. These initiatives have driven continuous process improvements and ensured regulatory compliance across large-scale industrial projects.
I hold a vocational certificate in electronics, a higher vocational certificate in electrical power, and a bachelor's degree in business administration specializing with a focus on service industry management from Western University, Thailand. Additionally, I possess numerous certifications, including ISO9001:2015 Quality Management Systems Auditor, ISO45001:2018 Occupational Health & Safety Risk Management, and have multiple ASNT NDT Level II certifications including Radiographic, Magnetic Particle, Liquid Penetrant Testing, and Visual Testing.
My qualifications, combined with my extensive practical experience, have sharpened my leadership abilities and equipped me to manage subcontractors while delivering exceptional results in compliance with industry standards.
Key Expertise:
Assisted in the development and implementation of the Construction Surveillance Program (CSP) for the ExxonMobil Integrated Team, where I:
On-site Duration, I have to implement Duties for monitoring and maintaining quality and compliance targets.
On-site, I am responsible for overseeing quality control of structural steel fabrication, ensuring adherence to shop drawings and project specifications.
The implementation station covers quality control of structural steel and piping fabrication, following the shop drawings and project specifications.
On-site Duration: Directly report to ExxonMobil’s Quality Lead for structural steel/piping fabrication and installation.
On-site Duration: Directly report to ExxonMobil’s Quality Lead for structural steel/piping fabrication and installation.
On-site Duration: I am responsible for implementing structural steel fabrication.
On-site Duration: I am responsible for implementing the structural steel/piping fabrication and installation.
On-site Duration: I am responsible for implementing the structural steel/piping fabrication and installation.
On-site Duration: I am responsible for implementing the structural steel fabrication.
On-site Duration: I am responsible for implementing the structural steel/piping fabrication and installation.
On-site Duration: I am responsible for implementing the structural steel/piping fabrication and installation.
On-site Duration: I am responsible for implementing the structural steel/piping fabrication and installation.
On-site Duration: I am responsible for implementing the fabrication and erection of all piping.
On-site Duration: I am responsible for implementing the fabrication and erection of all piping.
On-site Duration for the ITP Stage1-700 Mw Combined Cycle Power Plant (Package M-1), Thailand Aromatics Recovery Project. (Trap), Coco Pipeline Phase 3B Project, General Motor Project Contracts 3A (Fabrication Shop Nurn Kapork), 2nd Aircraft Maintenance Center Project II, 200 MW ALPHA POWER PLANT Project and Hydro Cracker Unit-2 (HCU-2) : I am responsible for implementing Piping Fabrication and Erection