Summary
Overview
Work History
Education
Skills
Heightcm
Weightkg
Militarystatus
Idcard
Training
Personal Information
Timeline
Generic
SAYAN PHINYO

SAYAN PHINYO

Piping Supervisor
Sriracha

Summary

Experience over 25 years for constructions works. Such as work shop fabrication and field installation about of piping of Oil & Gas, Refinery, Power plant, Petrochemical Industry, and mechanical maintenance, shut down and Turnaround works. Onshore/offshore works for assembly the platform module.


Diligent Piping Supervisor with strong background in overseeing piping projects. Demonstrated success in managing teams and ensuring compliance with safety standards. Proven ability to utilize problem-solving skills and effective communication to achieve project goals.

Overview

28
28
years of professional experience

Work History

Piping Supervisor

Samsung E&A (Thailand) Co.,Ltd.
04.2021 - Current
  • Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
  • Minimized disruptions to ongoing operations at client facilities by coordinating efficient scheduling of piping system maintenance activities.
  • Drove improved collaboration through enhanced communication across departments for complex piping projects.
  • Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
  • Increased project completion rates by consistently meeting deadlines and maintaining high-quality work standards in piping installations.
  • Reduced downtime for piping systems by conducting routine inspections and coordinating preventive maintenance work.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Prepared and submitted reports on job progress and safety conditions to upper management.

Piping Supervisor

Samsung Engineering (Thailand)
03.2020 - 03.2021
  • Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
  • Enhanced team productivity through effective delegation and monitoring of piping-related tasks.
  • Increased project completion rates by consistently meeting deadlines and maintaining high-quality work standards in piping installations.
  • Contributed to a reduction in rework costs by closely monitoring progress and promptly addressing any deviations from project specifications.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Prepared and submitted reports on job progress and safety conditions to upper management.

Mechanical Technician

Esso (Thailand) Public Company limited
02.2019 - 10.2019
  • Expanded knowledge on latest industry trends with ongoing professional development courses, staying current on best practices in mechanical maintenance technology.
  • Coordinated effectively with cross-functional teams during shutdowns or major repairs, optimizing productivity during critical periods while minimizing overall downtime.
  • Ensured optimal machine functionality by performing comprehensive inspections and calibrations as necessary.
  • Regularly communicated with operators to address concerns regarding machinery performance, fostering a proactive approach towards maintenance tasks.
  • Implemented a comprehensive safety program within the maintenance department, reducing workplace incidents by promoting safe work practices and proper use of protective equipment.
  • Contributed to a safer working environment by addressing potential hazards and promptly resolving any issues found during routine checks.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
  • Followed safety protocols to minimize workplace accidents.

Piping Supervisor

RMSC ENGINEERING CO., LTD.
07.2018 - 02.2019
  • Ensured compliance with industry regulations and safety protocols, resulting in a safer working environment for all team members.
  • Enhanced team productivity through effective delegation and monitoring of piping-related tasks.
  • Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
  • Contributed to a reduction in rework costs by closely monitoring progress and promptly addressing any deviations from project specifications.
  • Reduced downtime for piping systems by conducting routine inspections and coordinating preventive maintenance work.

Piping Supervisor

aibel (Thailand) limited
01.2013 - 09.2017
  • Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
  • Ensured compliance with industry regulations and safety protocols, resulting in a safer working environment for all team members.
  • Enhanced team productivity through effective delegation and monitoring of piping-related tasks.
  • Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
  • Increased project completion rates by consistently meeting deadlines and maintaining high-quality work standards in piping installations.
  • Participated in pre-construction meetings with clients, engineers, and other stakeholders to discuss project requirements, scope of work, and timelines for completion.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Created and implemented plans to maximize efficiency of workers.
  • Provided feedback to workers on job performance and safety procedures.

Piping Supervisor

Brunel Technical Services (Thailand) Limited.
07.2012 - 12.2012
  • Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
  • Ensured compliance with industry regulations and safety protocols, resulting in a safer working environment for all team members.
  • Enhanced team productivity through effective delegation and monitoring of piping-related tasks.
  • Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
  • Reduced downtime for piping systems by conducting routine inspections and coordinating preventive maintenance work.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Prepared and submitted reports on job progress and safety conditions to upper management.

Piping Supervisor

GS Engineering & Construction
08.2011 - 07.2012
  • Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
  • Ensured compliance with industry regulations and safety protocols, resulting in a safer working environment for all team members.
  • Enhanced team productivity through effective delegation and monitoring of piping-related tasks.
  • Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
  • Increased project completion rates by consistently meeting deadlines and maintaining high-quality work standards in piping installations.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Created and implemented plans to maximize efficiency of workers.
  • Provided feedback to workers on job performance and safety procedures.
  • Directed projects according to schedule and quality demands.

Piping Supervisor

Doosan Heavy Industries & Construction
01.2011 - 08.2011
  • Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
  • Ensured compliance with industry regulations and safety protocols, resulting in a safer working environment for all team members.
  • Enhanced team productivity through effective delegation and monitoring of piping-related tasks.
  • Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Prepared and submitted reports on job progress and safety conditions to upper management.

Piping Supervisor

Samsung Engineering
10.2009 - 02.2010
  • Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
  • Enhanced team productivity through effective delegation and monitoring of piping-related tasks.
  • Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Prepared and submitted reports on job progress and safety conditions to upper management.

Testing Supervisor

BRUNEL Technical Services (Thailand) Limited
01.2008 - 01.2009
  • Investigated root causes of defects, providing valuable feedback to development teams for corrective actions.
  • Spearheaded efforts to automate repetitive tasks, increasing productivity and reducing manual effort in the testing process.
  • Delivered high-quality products by enforcing rigorous adherence to established testing standards and methodologies.
  • Contributed to ongoing process improvements by proactively identifying opportunities for optimization in existing test methodologies.
  • Enhanced testing efficiency by implementing streamlined processes and procedures.
  • Established key performance indicators to measure progress and drive continuous improvement in the testing process.
  • Coordinated regular status meetings with stakeholders to provide updates on testing progress and address any concerns or challenges encountered during the course of a project.
  • Reduced testing errors by implementing thorough documentation practices for accurate recordkeeping.

Hydro Testing Supervisor

Clough (Thailand) Co.,Ltd
01.2007 - 10.2008
  • Contributed to ongoing process improvements by proactively identifying opportunities for optimization in existing test methodologies.
  • Optimized resource allocation through capacity planning, aligning available resources with project demands.
  • Enhanced testing efficiency by implementing streamlined processes and procedures.
  • Utilized risk-based approach in prioritizing test activities, focusing on high-impact areas for maximum return on investment.

Maintenance Supervisor

CES consortium expert team & SVS Oilfield service
01.2006 - 01.2007
  • Supervised a team of technicians, providing guidance on complex repair tasks and fostering professional development opportunities.
  • Assisted in the planning and execution of facility expansions, ensuring proper installation of new equipment and seamless integration with existing systems.
  • Coordinated preventative maintenance schedules, verifying equipment safety and function.
  • Observed guidelines, specifications, and detailed instructions to meet strict operational and maintenance regulations.
  • Monitored employee work tasks while installing, aligning, and balancing new equipment for projects.
  • Paid close attention to guidelines, specifications, and detailed instructions to continuously adhere to strict operational and maintenance regulations.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Monitored daily progress and work quality to provide guidance and direction to mechanics and installers.
  • Scheduled and oversaw maintenance, repair and installation activities.

Piping Foreman

Hyundai engineering and construction company limited
05.2001 - 03.2002
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Safeguarded the integrity of piping systems by conducting thorough testing procedures including leak checks, pressure tests, and visual inspections upon completion of installations.
  • Successfully met or exceeded project deadlines consistently by prioritizing tasks based on urgency and resource availability.
  • Developed comprehensive project reports outlining progress, challenges, and recommendations for future work.
  • Conducted quality control inspections throughout all stages of the project lifecycle to ensure high levels of workmanship were maintained consistently.
  • Ensured safety compliance through regular inspections of tools and equipment, conducting toolbox talks, and enforcing company policies.
  • Completed daily logs and progress reports.

Piping Foreman

EMCO (Thailand) company limited
12.1999 - 09.2000
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Safeguarded the integrity of piping systems by conducting thorough testing procedures including leak checks, pressure tests, and visual inspections upon completion of installations.
  • Successfully met or exceeded project deadlines consistently by prioritizing tasks based on urgency and resource availability.
  • Developed comprehensive project reports outlining progress, challenges, and recommendations for future work.
  • Conducted quality control inspections throughout all stages of the project lifecycle to ensure high levels of workmanship were maintained consistently.
  • Ensured safety compliance through regular inspections of tools and equipment, conducting toolbox talks, and enforcing company policies.
  • Completed daily logs and progress reports.

Piping Foreman

Nasco engineering company limited
01.1997 - 09.1997
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Safeguarded the integrity of piping systems by conducting thorough testing procedures including leak checks, pressure tests, and visual inspections upon completion of installations.
  • Successfully met or exceeded project deadlines consistently by prioritizing tasks based on urgency and resource availability.
  • Developed comprehensive project reports outlining progress, challenges, and recommendations for future work.
  • Conducted quality control inspections throughout all stages of the project lifecycle to ensure high levels of workmanship were maintained consistently.
  • Ensured safety compliance through regular inspections of tools and equipment, conducting toolbox talks, and enforcing company policies.
  • Completed daily logs and progress reports.

Education

Royal University of Sukhothai Thammathirat

Skills

ProCoSys Completion System

undefined

Heightcm

160

Weightkg

62

Militarystatus

Exempted

Idcard

3 5504 00299 05 4

Training

  • HDPE Butt fusion machine, 07/24/18
  • Roll Grooving machine, 07/24/18
  • Behavior based safety (BBS) introduction, 10/01/17
  • Olympus videos cope IPLEX RT training, 10/08/15
  • +6 Safety training consultancy, 10/01/14
  • Behavior based safety (BBS) introduction, 10/01/13
  • Radiographic Testing (RT), Metcon / 12 / 1945, 07/01/12
  • Penetrate Testing (PT), Metcon / 12 / 1953, 07/01/12
  • Magnetic Testing (MT), Metcon / 12 / 1960, 07/01/12
  • GS Accident Incident prevention program, 09/19/11 - 09/22/11
  • Basic First Aid Training and Rescue, 07/01/08
  • Safety Officer Training Course, 07/01/08

Personal Information

  • Specialization: Experience more than 20 years for constructions works. Such as work shop fabrication and field installation about of piping of Oil & Gas, Refinery, Power plant, Petrochemical Industry, and mechanical maintenance, shut down and Turnaround works. Onshore/offshore works for assembly the platform module.
  • Age: 51
  • Ethnicity: Thai
  • Passport Number: AA8455341
  • Date of Birth: 06/07/73
  • Gender: Male
  • Nationality: Thai
  • Marital Status: Married
  • Religion: Buddhism

Timeline

Piping Supervisor

Samsung E&A (Thailand) Co.,Ltd.
04.2021 - Current

Piping Supervisor

Samsung Engineering (Thailand)
03.2020 - 03.2021

Mechanical Technician

Esso (Thailand) Public Company limited
02.2019 - 10.2019

Piping Supervisor

RMSC ENGINEERING CO., LTD.
07.2018 - 02.2019

Piping Supervisor

aibel (Thailand) limited
01.2013 - 09.2017

Piping Supervisor

Brunel Technical Services (Thailand) Limited.
07.2012 - 12.2012

Piping Supervisor

GS Engineering & Construction
08.2011 - 07.2012

Piping Supervisor

Doosan Heavy Industries & Construction
01.2011 - 08.2011

Piping Supervisor

Samsung Engineering
10.2009 - 02.2010

Testing Supervisor

BRUNEL Technical Services (Thailand) Limited
01.2008 - 01.2009

Hydro Testing Supervisor

Clough (Thailand) Co.,Ltd
01.2007 - 10.2008

Maintenance Supervisor

CES consortium expert team & SVS Oilfield service
01.2006 - 01.2007

Piping Foreman

Hyundai engineering and construction company limited
05.2001 - 03.2002

Piping Foreman

EMCO (Thailand) company limited
12.1999 - 09.2000

Piping Foreman

Nasco engineering company limited
01.1997 - 09.1997

Royal University of Sukhothai Thammathirat
SAYAN PHINYOPiping Supervisor