Establish annual maintenance budget., Follow annual plan maintenance PM and Overhaul from subordinate., Maintenance and repair with data analysis to engineering programs through the application of professionally accepted engineering techniques, practices and procedures., Management spare part, control stock min-max by lead time and aging spare part., Activity to TPM system PM pillar leader., Comparison of new machinery for investment., Re-layout and Renovate line to support production layout suitable., Accept to the performance new machine to foreign., Develops to the machine to suit the process., Preventive maintenance document preparation (Triggering, Monitoring, Trouble shooting)., Follow breakdown analysis from subordinate., Created and control the procedure sheet, Flow chart, Control plan, FMEA (Failure Mode and Effect Analysis)., Increase duration of MTBF, Reduce duration of MTTR., Plan maintenance PM, Overhaul instrument equipment., Solving problems measuring instrument in process., Plan and follow-up internal and external calibration measuring instrument., Record and maintain to report internal and external calibration., Verification by measurement tool., Use Hart communication, AMETEX, Fluke meter, Thermometer, standard weight with measuring instrument., Coordinating to suppliers with external calibration., Calibration the master tool to external.