Job field: Mechanical engineer
Location: All Industries Expect
Salary/Month: Refer to company policy
Working days: Refer to company policy
Production : D225 DSAM Project
- Monitor and control coordinate of all works and activities of construction at site.
- Prepare Bid tabulation and IPO
- Controls the performances of all subcontractors are perform in accordance with the procedures, specifications.
- Equipment preservation control.
- Manage paint cost and quantities.
- Prepare work variation request for addition work submit to customer
Production: D215 RCA5 Project (VINYTHAI)
- Site Preparation all temporary work.
- Prepare subcontracting conditions and requirement , Work volume, Scope of work and supply
- Prepare Bid tabulation and IPO
- Set up Kick of meeting all subcontractors.
- Monitor and control coordinate of all works and activities of construction at site.
- Transportation equipment at site and support lifting work.
- Final walk through and close punch
Production: D198B ETP Cover Project (Thai oil)
- Control package system ( Thai-oil only program)
- Final walk through and close punch
Production: D199 PVC Pilot Plant Project (VINYTHA)
- Prepare subcontracting conditions and requirement, Work volume, Scope of work and supply
- Prepare Bid tabulation and IPO
- Monitor and control coordinate of all works and activities of construction at site.
- Controls the performances of all subcontractors are perform in accordance with the procedures, specifications.
Production: D192 Plant Construction, Petrochemical (SCG #7 MOCD2 Project Rayong)
- Monitor and control coordinate of all works and activities of construction at site.
- Control the performances of all subcontractor are perform in accordance with the procedures, specifications.
- Monitor and expedite the work schedules to meet the master construction schedule.
- Erection progress civil work about foundation, precast, and concrete road.
- Transportation equipment at site and support lifting work.
- Erection progress and installation of steel structure, metal sheet including fabrication and modify damage of material.
- Maintenance flange reface machine for piping work because of flange damage follow ASME.
- Installation special part and utilities piping work such as hose rack, vent stack.
- Hydro test line pipe superheat follow P&ID.
Production: Power Plant
- To support mechanical engineer to overhaul fogging pump, the pump type is displacement pump (piston).
- To support mechanical engineer to overhaul UF backwash pump, the pump type is centrifugal pump.
- To support mechanical team handling PM works of lube oil pump changing.
- To study gas turbine equipment due to Major inspection scope such as compressor section clean all blade, repair coating at bell mouth, combustion section replace liner, transition piece, flow sleeve and turbine section replace bucket No. 1-3, nozzle stage No. 1-3, shroud stage No. 1-3
- To studies about routine check of Plant Operator such as parameters record on site, to monitor all equipment condition running on site, to report plant status to mechanical engineer
Basic solid work 2013 vision
Basic Auto CAD 2007 vision
Word, Excel, Power Point