Innovative problem-solver with keen eye for detail and positive, upbeat approach to complex engineering challenges. Possesses in-depth understanding of electrical/Mechanical systems and infrastructure management, with strong proficiency in project planning and execution. Committed to delivering impactful solutions that drive operational efficiency and enhance overall system performance.

Engineering professional known for high standards and result-driven approach. Extensive experience in leading engineering initiatives and implementing innovative solutions. Strong focus on team collaboration and adaptability to evolving project needs. Skilled in technical analysis and strategic planning.

Overview

17
17
years of professional experience

Work History

Data Center Engineering Operation (Chief Engineer)

Amazon Web Service
01.2023 - Current
  • Company Overview: Data center building (AWS)
  • Involved construction control & Project management
  • I was applied local regulations/standard code to implementation with global design prior construction phase
  • Coordinate Local/Provincial government organization (Construction permit/ Building permit /Generator permit) e.g., PEA/PWA/IEAT/SAO /DIW
  • Commissioning Inspection Critical/Non critical system (Electrical / Mechanical /Control / Cooling / Utility system) prior handover
  • Overseas Factory Acceptance Test product
  • Lead team to Installation Inspection work during construction phase
  • Lead team to compliance regulation (Electrical / Water / Waste/ fuel storage)
  • Lead project 115/22kV substation 2 Feeders
  • Lead operation team for O&M critical system e.g., UPS system and Automatic transfer / Generator / M.V
  • & L.V
  • Power distribution unit / Chillers Air Cooled / AHU
  • Building Monitoring System (Schneider)
  • Perform design review/revise and data to support expansion new building in part of electrical system
  • Lead team member to Operation and maintenance
  • Lead project to Certify Global program
  • (Electrical / Mechanical)
  • Improvement of mechanical, electrical, and construction as needed project by project
  • Strong hands-on and theoretical about the electrical system such as cable wiring, electrical troubleshooting, and electrical device installation and uninstallation
  • Authorize to be Global Single point of failure Design committee
  • CAPEX / OPEX
  • Overall readiness (Global Audit)
  • Data center building (AWS)

Critical Infrastructure Technician Level 3 (Senior Engineer)

Supernap Thailand
03.2017 - 12.2023
  • Company Overview: Data center building (Certified Tier 4 standard)
  • New Plant Construction Control / Commissioning / Operation and Maintenance
  • Construction Control & Project management
  • Buyoff & Inspection all system (Electrical / Mechanical/ Control / Utility system)
  • Test & commissioning all system before operating all system
  • 22/11kV Generator & Switchgear redundancy design N+1 Concept
  • UPS system and Automatic transfer (without interruptible)
  • Building Monitoring System
  • Perform design and data to support expansion new building in part of electrical system
  • Sale support for customize design in computer room to support customer require
  • Lead to coach team member to practice switchgear operation and maintenance
  • Lead project renewable solar farm capacity 1 MW feed to main power incoming by 11 kV
  • Implement data center improvement of mechanical, electrical, and construction as needed project by project
  • Strong hands-on and theoretical about the electrical system such as cable wiring, electrical troubleshooting, and electrical device installation and uninstallation
  • UPS ON load testing to test that UPS is still able to support load between electrical shortage as it designed time
  • Generator maintenance, battery starter conductance testing, cooling water measurement, lubricant measurement, No load test, and on load bank test
  • Pre-action and fire pump maintenance, performing weekly fire suppression system tests
  • Strong hands-on and theoretical about the mechanical system, I can install, uninstall, clean, and troubleshoot air conditioners
  • Perform Mechanical preventive and corrective maintenance myself for small to medium working scale and manage contractors to perform preventive and corrective maintenance for large working scale
  • Data center building (Certified Tier 4 standard)

Electrical Project Engineer

SAIC Motor – CP Co., Ltd.
07.2015 - 03.2017
  • Company Overview: Vehicle Assembly Factory
  • Phase 1: Setup new Plant Project
  • Establish new plant with utility system for new building readiness such as Electrical system
  • Submit document for new building readiness for production under IEAT regulation / PEA regulation
  • Design plant layout and with utility supplies
  • Project budget control for new building readiness
  • Coordinated with Industrial estate to permission building / discussion regulation
  • Phase 2: Maintain Current Plant / New Project for support plant
  • Upgrade & modify building with utility system for existing plant readiness such as Electrical system
  • Design project / estimate cost / project control / Budget control /Safety control
  • Coordinated with internal and contractor to setup utilities supply for machine production
  • Coordinated with Industrial estate (Hemaraj) to claim building / discussion regulation
  • Vehicle Assembly Factory

Electrical Project Engineer

Nissan Motor Thailand
04.2012 - 06.2015
  • Company Overview: Vehicle Assembly Factory
  • Setup new Plant Project / Maintenance
  • Design New plant layout and utility supply with Nissan global
  • Project budget control for new building readiness
  • Coordinated with internal and contractor to setup utilities supply for machine production
  • Setup new utility system for new building readiness such as Electrical system
  • Scheduling the plant readiness and weekly meeting to present and updated for Management team
  • Budget Control (OPEX / CAPEX)
  • Energy Saving > Submit energy report to Ministry of Energy
  • Energy Saving > coordinate with Nissan Global standard
  • Building Monitoring System (Yokogawa) (Operation / energy management)
  • Trouble shoot all electric failure and recovery within time limit
  • Take new technology to improve system to utilities system
  • Vehicle Assembly Factory

Facility Chief Engineer

KEIHIN Auto Parts (Thailand) Ltd.
06.2008 - 04.2012
  • Company Overview: Automotive Parts
  • Maintenance and operate to utility equipment for support production line such as Chiller, Cooling tower, Motor pump, Air compressor, Air Handling Unit, Wastewater treatment, Lighting, Generator, Fire hydrant pump, etc
  • Contact supplier to preventive maintenance utility equipment
  • Support long weekend plant service and maintenance (New Year & Songkran)
  • New Factory Project responsible
  • Recovery all utility system and building after disaster Flood in 2011 until prefer to production
  • Automotive Parts

Education

Bachelor of Electrical Engineering - Electrical Engineering

Rajamangala University of Technology Thanyaburi
Pathum Thani, Thailand
04-2008

Skills

  • Troubleshooting
  • Project management
  • Operations management
  • Engineering design
  • Infrastructure management
  • Electrical engineering standards

Timeline

Data Center Engineering Operation (Chief Engineer)

Amazon Web Service
01.2023 - Current

Critical Infrastructure Technician Level 3 (Senior Engineer)

Supernap Thailand
03.2017 - 12.2023

Electrical Project Engineer

SAIC Motor – CP Co., Ltd.
07.2015 - 03.2017

Electrical Project Engineer

Nissan Motor Thailand
04.2012 - 06.2015

Facility Chief Engineer