Electrical engineer and maintenance engineer trained in electrical and solar cell scopes. Looking to apply my 5+ years of skill and experience in new opportunities.
• Project Toyota Kabinburi Ph2 (Kabinburi, Prachinburi) (71.28 kWp)
• Project Residence (Taling Chan, Bangkok) (17.82 kWp)
• Project Baby sensory (Nonthaburi) (6.12 kWp)
• Project House (Don Mueang, Bangkok) (9.945 kWp)
• Project Isuzu Prachinburi (Prachinburi) (65.61 kWp)
• Project Isuzu Sa Kaeo (Sa Kaeo) (138.51 kWp)
• Project Yamaha Prachinburi (Prachinburi) (14.28 kWp)
• Project K.Vichan’s House (Prachinburi) (6.12 kWp)
• Project Kobe-Ya Industrial Ring Rd. (Yan Nawa, Bangkok) (41.8 kWp)
• Project Kobe-Ya Rama 3. (Yan Nawa, Bangkok) (35.1 kWp)
• Project Kobe-Ya Mahachai. (Samut Sakhon) (180 kWp)
• Project F-Tech (Uthai, Phra Nakhon Si Ayutthaya) (997.35 kWp)
• Project Namchow (Ban Pong, Ratchaburi) (1,308.62 kWp)
• Project SNC (Chonburi) (477.04 kWp)
• Project Hirosei (Si Racha, Chonburi) (994.08 kWp)
- Preparing BOQ for proposal and quotation
- Controlling electrical installation work to achieve the project schedule
- Presenting work progress to the project owner
- Managing and solving all urgent problems with the best solution at the time
- Managing manpower and constructor to perform the highest performance with the reasonable cost
- Coordinating with partners and related companies to achieve the project goal
- Installing, maintenance, operating and troubleshooting solar system
- Designing Solar systems and providing the best solar solution to customer
- Making data for the PVsyst program
• Project Airport Rail Link (Phetchaburi 47, Bangkok)
- Installing, maintenance, operating, and troubleshooting signaling equipment
• Project Royal Thai Army-Skydive Simulator (Lopburi)
(Transformer 2,000 kVA 2 Units)
- Controlling electrical installation work to achieve the project schedule
- Presenting work progress to the project owner
- Solving and managing all urgent problem with the best and fastest solution
- Managing manpower and constructor with optimized cost and high-performance solution
- Coordinating with the related companies to achieve the project goal
• Project TE-T1 (Sukhumvit 40, Bangkok)
Office building 29 floors (Transformer 2,000 kVA 2 Units)
- Controlling electrical installation work to achieve the project schedule
- Presenting work progress to the project owner and consult
- Solving and managing all urgent problem with the best and fastest solution
- Managing manpower and constructor with optimized cost and high-performance solution
• Project Phetkasem building project (Phetkasem 33/4-33/6, Bangkok)
Head Office (UOB Bank) 18 floors
(Transformer 2,500 kVA 2 Units, 1,250 kVA 2 Units, 1,000 kVA 2 Units)
- Controlling electrical installation work to achieve the project schedule
- Presenting work progress to the project owner and consult
- Solving and managing all urgent problem with the best and fastest solution
- Coordinating with the related companies to achieve the project goal
• Project MONO-NB (Pakkret, Nonthaburi)
Studio & Basketball court (Transformer 1,250 kVA, 500 kVA 2 Units)
- Estimating and making BOQ for making the project proposal
- Controlling electrical installation work to achieve the project schedule
- Presenting work progress to the project owner
- Solving and managing all urgent problem with the best solution
- Managing manpower and constructor with optimized cost and high-performance solution
• Project World peace valley 3 (Pakchong, Nakhonratchasima)
Meditation centre 11 floors (Transformer 1,600 kVA 2 Units)
- Controlling electrical installation work to achieve the project schedule
- Presenting work progress to the project owner and consult
- Solving and managing all urgent problem with the best solution
Maintenance of Electrical system
Professional practice license (Associate Electrical Engineer Power)
Safety in working at heights license
TOEIC (Test of English for International Communication): 425
Safety officer supervisory level license
Professional practice license (Associate Electrical Engineer Power)