PERSONAL DATA:
Date of Birth : August 16th,1987
Gender : Male Age : 35
Nationality : Thai
Race : Thai
Religion : Buddhism
Marital status : Single
Height : 186 Cm. Weight : 84 kgs. Health : Excellen
More than 10 years’ work experienced of Engineering functions by responsible for new model, product and In-process quality control, production line improvement to increase capacity and cost reduction in automotive manufacturing industry.
•Proceed by follow the policy and regulation in quality term, including the standard regulation of quality management.
•Planning, Control and preparing reports about production processes.
•Manage manpower and controlling employees’ works.
•Improve production efficiency and quality.
•Planning to improve employees’ skills and work improvements.
•Planning for new model and control OEE
•Joy in production activities, inside or outside department as well.
•Solve and prevent trouble things continuously.
•Manage in Safety and Sanitation fields.
•Prepare document for production ( WI , PFMEA,Control plan , SOP )
• Responsible to arrange the meeting with all relevant departments to support customer request and visit in factory. Clarified all customer requires to team to prepare necessary document and equipment.
• Performed checking basic information of each customer order to ensure that all details met customer requirement.
• Coordinated and negotiated with customer in case of any delivery was not done as schedule and commitment.
• Coordinated with production department to receive the job and product as customer required.
• Received the information of new product (New items) then collected all information and submitted to next upper department.
• Planned annual sale in advance then manage and monitor to ensure the plan and actual sale achieved the target. Worked with team to improve simi-annual sales.
• Prepared document and information for price negotiation, price reduction and price increment to customer.
• Created cost breakdown for press part process and performed analysis.
• Worked with supplier to develop fabrication process of dies, jigs and CFs.
• Controlled and monitored suppliers to develop parts and tooling to ensure that the parts had good quality and on-time delivery before mass production phase will be started.
• Controlled customer’s documents such as drawing, CAD data, other standard documents and properly performed record retention.
• Prepared and collected all related documents for PPAP package then submitted to customer for approval.
• Visited parts ‘supplier as planned to check any action in part of Part and Tooling development process to ensure that suppliers produced the parts met quality and delivery requirement.
• Signed off any project of tooling, sample, trial record, machine condition, tooling setup, sample part trial and other problems.
• Supported customer for part development process before mass production.
• Managing whole Machine / Equipment / Process, To meet company target and Launch timing, under budget also timing.
•Create and verify the scope of work for new project and current factory to support the production process
• Prepare machine, equipment and new machine for new model.
• Create and modify jig and tools for startup new model and mass production car.
• Create tooling and process PR for new project to follow up action plan.
• Coordinate for new model of vehicle from start up until launch time to mass production.
• Verify the project budgetary to saving, comparison BOM list, Price schedule and understanding the scope of work as well.
• Responsibility for equipment validation procedures including calibration and qualification
• Identify equipment critical spare parts and ensure sufficient coverage to prevent extend downtime situation
• The participate buyoff Machine and equipment to supplier.
• Debug and optimize automated processes and improve cycle time for Capacity up - Down.
• Must be performed by commander order and follow company policy and regulation.
• Managing team equipment are meet require engineering standard, motivate team drive project to achieve company goal
• Responsible to support the data and information to manager for all requirements from head office and company.
• Submitted Request for Quotation (RFQ) document to supplier for dies, jigs, fixtures and DFs.
• Placed purchase order for dies, jigs and CFs.
• Performed supplier evaluation and submit the result to manager for final approval.
• Evaluated and selected supplier of component parts such as materials, bolts, nuts, pipes, round bars, machine-pressed parts, laser process parts and surface finished.4
• Prepared and collected the quotation then proposed to customer for getting the approval.
• Arranged the meeting with TPT’s Team to inform any customer requirement, set up the action plan and follow up each action.
• Reviewed Quality procedure (QP), Work instruction (WI) and supported documents related to Sales department.
• Created cost breakdown for press part process and performed analysis. • Worked with supplier to develop fabrication process of dies, jigs and CFs.
• Controlled and monitored suppliers to develop parts and tooling to ensure that the parts had good quality and on-time delivery before mass production phase will be started.
• Controlled customer’s documents such as drawing, CAD data, other standard documents and properly performed record retention.
• Prepared and collected all related documents for PPAP package then submitted to customer for approval.
• Visited parts ‘supplier as planned to check any action in part of Part and Tooling development process to ensure that suppliers produced the parts met quality and delivery requirement.
• Signed off any project of tooling, sample, trial record, machine condition, tooling setup, sample part trial and other problems.
• Supported customer for part development process before mass production.
2016 – 2018 : New model for new Pajero car) – Front floor, Rear floor, Engine room line.
2013 – 2015 : New model for new Triton car) – Front floor line.
2012 – 2013 : New model for Attrage car) – Under Sub line.
2011 – 2012 : New model for Mirage car) – Under body line.
• Responsible for project management of new model, capacitor and line improvement and cost reduction.
• Created job specification sheet, performed bidding with maker and supplier, performed price breakdown and comparison.
• Created AR&PR documents to control installation, control cycle time and product quality.
• Followed up and worked with team to investigate and solve the problem and responsible to transfer job and product to customer.
• Planned to use each machine, reviewed manpower and production volume to meet internal target and customer requirement.
• Monitored and controlled production process to ensure that any quality problem found was solved in timely manner and not impact on production shut down.
• Preformed planning and preparing the estimated budget to launch NPI project.
• Reviewed and determined manpower, equipment and raw material which were needed for production demand.
• Prepared machine and tooling such as jig, transformer, PS gun, Air tool, Pallet, Torque, Wrench. Confirmed supplier specification to get best QCD. Prepared AR and PR document to order those machines/tooling.
• Prepared the documents for new model such as Process planning sheet, layout, FMEA, Control plan etc.
• Fully supported new model launch since initial stage until mass production phase (JT, PJ, PL, PT, PP, MP)
• Weekly reviewed and confirmed process planning, cycle time, workability and manpower.
• Controlled BIW and Sub-parts preparation and supported part improvement both In-house and supplier.
• Responsible for management of change (4M) to ensure that any change was recorded, controlled and implemented in timely manner and correctly.
• Responsible for quality assurance functions at Compressor Fac machine line.
• Controlled and monitored disposal rate in machine line.
• Controlled and managed In-house calibration process.
• Conducted audit in production line and followed up any problems found from audit.
• Controlled and tested impurity.
• Responsible for management of change (4M) to ensure that any change was recorded, controlled and implemented in timely manner and correctly.
• Controlled product rework process at machine line.
• Supported other QA jobs and activities as supervisor and manager assigned.
Languages : Thai (Native), English (Fluent)
undefined